Introduction to the Case
"A conflict of interest is like dirt in a sensitive gauge," one that cannot only soil one person's career, but can also taint an entire profession. Thus, as professionals, engineers must be ever alert to signs of conflict of interest. The case of the American Society of Mechanical Engineers (ASME) vs. Hydrolevel Corp. shows how easily individuals, companies, and professional societies can find themselves embroiled in expensive legal battles that tarnish the reputation of the engineering profession as a whole.
In 1971, the engineering firm of McDonnell and Miller requested an interpretation of the ASME Boiler and Pressure Vessel ("BPV") Code from the ASME Boiler and Pressure Vessel Codes Committee. Although initially undisclosed by them, McDonnell and Miller used the response to their inquiry to show that a boiler control device competitor, the Hydrolevel Corp., was selling a device not in compliance with the ASME BPV Code.
T.R. Hardin, chairman of the ASME committee and employee of the Hartford Steam Boiler Inspection and Insurance Company in Connecticut, wrote the original response to McDonnell and Miller's inquiry. ASME's interpretation was used by McDonnell and Miller salesmen as proof of Hydrolevel's noncompliance. Subsequently, Hydrolevel never acquired sufficient market penetration for sustaining business, and eventually went bankrupt.
As a result, Hydrolevel sued McDonnell and Miller, the Hartford Steam Boiler Inspection and Insurance Company, and ASME on the basis of restraint of trade. Hydrolevel's lawyers argued that two key ASME subcommittee members acted not only in the self-interest of their companies, but also in violation of the Sherman Anti-Trust Act.
McDonnell and Miller and the Hartford Steam Boiler Inspection and Insurance Company settled out of court, but the litigation against ASME went all the way to the Supreme Court where, on a 6-3 decision, the Court found in favor of Hydrolevel on the liability issue. Following a damages retrial, the case was settled for $4.75 million in favor of Hydrolevel.
Organizations and People Involved
American Society of Mechanical Engineers (ASME)
B-PV Code Heating Boiler and Pressure Vessel committee:
Insurance company
|
Key Dates
1971 - Hydrolevel receives contract from Brooklyn Union Gas.
McDonnell and Miller, Inc., request an interpretation of the ASME Boiler and Pressure Vessel (B-PV) Code from the ASME Boiler and Pressure Vessel Codes Committee. April 1971 - Dinner meeting between James, Mitchell, and Hardin, where discussion of code interpretation was discussed.April 12, 1971 - McDonnell and Miller make a formal request, in writing, for ASME code interpretation.April 29, 1971 - Hardin responds to McDonnell and Miller request.March 23, 1972 - Hydrolevel requests an ASME review and ruling correction. May 1972 - ASME Subcommittee meets to discuss Hydrolevel inquiry. June 9, 1972 - ASME makes a second response to code in question.August 23, 1975 - Hydrolevel files suit against McDonnell and Miller, Inc., ASME and the Hartford Steam Boiler Inspection and Insurance Company, charging them with conspiracy to restrain trade under the Sherman anti-trust law. All but ASME settle out of court.February 2, 1979 - Jury returns guilty verdict. Hydrolevel Chief Executive Officer dies of heart attack when the news reaches him in the hospital. April 1981 - ASME takes the case to the Supreme Court. Ma y 17, 1982 - High Court votes 6-3, finding ASME guilty of anti-trust violations.
Background
Boiler and Pressure Vessel Codes and Conflicting Self-Interest
One role of the American Society of Mechanical Engineers (ASME) is the development of voluntary safety codes and standards. These standards are specified for a myriad of mechanical devices, ranging from nuts and bolts to elevators, cranes and boilers. ASME Codes and Standards are regularly referred to by federal, state, and local government regulatory authorities. In addition, they are often given force of law, ensuring buildings and the equipment inside them are safely designed and built. By 1984, 46 US states and the 10 Canadian provinces had incorporated the ASME Boiler and Pressure Vessel BPV Code as law.
In 1971, Eugene Mitchell, Vice President for Sales at McDonnell and Miller, Inc., located in Chicago, was concerned about his company's ability to persist in its dominance of the market for heating boiler low-water fuel cutoff valves. Heating boilers must have a low-water fuel cutoff to ensure that boilers cannot be fired without sufficient water in them, for deficient water could cause an explosion.
Hydrolevel Corporation entered the low-water cutoff valve market with an electronic low-water fuel supply cutoff that included a time delay on some of its models. Hydrolevel's valve had won important approval for use from Brooklyn Gas Company, one of the largest installers of heating boilers. Some Hydrolevel units added the time delay devices so the normal turbulence of the water level at the electronic probe would not cause the fuel supply to be turned on and off in rapid cycles. Mitchell felt that McDonnell and Miller's sales could be protected if he could secure an interpretation stating that the Hydrolevel time-delay on the cutoff violated the ASME BPV Code. He referred to the following section of the ASME code:
Thus, Mitchell asked for an ASME interpretation of the mechanism for operation of the Hydrolevel device as it pertained to the above section of the code. He did not, however, specifically mention the Hydrolevel device in his request.
Mitchell discussed his idea several times with John James, McDonnell and Miller's Vice President for Research. In addition to his role at McDonnell and Miller, James was on the ASME subcommittee responsible for heating boilers and had played a leading role in writing the part of the Boiler Code that Mitchell was questioning.
James recommended that he and Mitchell approach the chairman of the ASME Heating Boiler Subcommittee, T.R. Hardin. Hardin was also Vice President of the Hartford Steam Boiler Inspection and Insurance Company. When Hardin arrived in Chicago in early April, 1971 on other business, the three men went to dinner at the Drake Hotel. During dinner, Hardin agreed with Mitchell and James that their interpretation of the code was correct.
Shortly after the meeting with Hardin, James sent ASME a draft letter of inquiry, and sent Hardin a copy. Hardin made some suggestions, and James incorporated Hardin's suggestions in a final draft letter. James' finalized draft letter of inquiry was then addressed to W. Bradford Hoyt, Secretary of the BPV Boiler and Pressure Vessel Committee.
Hoyt received thousands of similar inquiries every year. Since Hoyt could not answer James's inquiry with a routine response, he directed the letter to the appropriate Subcommittee Chairman, T.R. Hardin. Hardin drafted a response without consulting the whole subcommittee, a task he had authorization for if the response was treated as an "unofficial communication."
Hardin's response, dated April 29, 1971, stated that a low-water fuel cutoff must operate immediately. Although this response did not say that Hydrolevel's time-delayed cutoff was dangerous, McDonnell and Miller's salesmen used Hardin's conclusion to argue against using the Hydrolevel product. This was done at Mitchell's direction.
In early 1972, Hydrolevel learned of the ASME letter through one of its former customers who had a copy of the letter in his possession. Hydrolevel then requested an official copy of the letter from ASME. On March 23, 1972, Hydrolevel requested an ASME review and ruling correction.
ASME's Heating and Boiler Subcommittee had a full meeting to discuss Hydrolevel's request, and confirmed part of the original Hardin interpretation. James, who had replaced Hardin as Chairman of the Subcommittee, refrained from participating in the discussion, but subsequently helped draft a critical part of the Subcommittee's response to Hydrolevel. The ASME response was dated June 9, 1972.
In 1975, Hydrolevel filed suit against McDonnell and Miller, Inc., ASME and the Hartford Steam Boiler Inspection and Insurance Company, charging them with conspiracy to restrain trade under the Sherman anti-trust law.
Hydrolevel reached an out-of-court settlement with McDonnell and Miller and Hartford for $750,000 and $75,000, respectively. ASME took the case to trial. ASME officials believed that, as a society, ASME had done nothing wrong and should not be liable for the misguided actions of individual volunteer members acting on their own behalf. After all, ASME gained nothing from such practices. ASME officials also believed that a pre-trial settlement would set a dangerous precedent that would encourage other nuisance suits.
Despite ASME arguments, however, the jury decided against ASME, awarding Hydrolevel $3.3 million in damages. The trial judge deducted $800,000 in prior settlements, and tripled the remainder in accordance with the Clayton Act. This resulted in a decision of $7,500,000 for Hydrolevel.
On May 17, 1982, ASME's liability was upheld by the Second Circuit. The Supreme Court, in a controversial 6-3 vote, found ASME guilty of anti-trust violations. The majority opinion, delivered by Justice Blackmun, read as follows:
The issue of damages was retried in a trial lasting for approximately one month. In June, the jury returned a verdict of $1.1 million which was tripled to $3.3 million. Parties involved were claiming attorney's fees in excess of $4 million, and a final settlement of $4,750,000 was decreed.
Following the decision, ASME revised its procedures as follows:
In the wake of the Hydrolevel ruling, the Society has changed the way it handles codes and standards interpretations, beefed up its enforcement and conflict-of-interest rules, and adopted new "sunset" review procedures for its working bodies.
The most striking changes affect the Society's handling of codes and standards interpretations. All such interpretations must now be reviewed by at least five persons before release; before, the review of only two people was necessary. Interpretations are available to the public, with replies to nonstandard inquiries published each month in the Codes and Standards section of ME or other ASME publications. Previously, such responses were kept between the inquirer and the involved committee or subcommittee. Lastly, ASME incorporates printed disclaimers on the letterhead used for code interpretations, spelling out their limitations: that they are subject to change should additional information become available and that individuals have the right to appeal interpretations they consider unfair.
Regarding conflict-of-interest, ASME now requires all staff and volunteer committee members to sign statements pledging their adherence to a comprehensive and well-defined set of guidelines regarding potential conflicts. Additionally, the Society now provides all staff and volunteers with copies of the engineering code of ethics along with a publication outlining the legal implications of standards activities.
Finally, the Society now requires each of its councils, committees, and subcommittees to conduct a "sunset" review of their operations every two years. The criteria include whether their activities have served the public interest and whether they have acted cost-effectively, in accordance with Society procedures.
The ASME case raises serious questions about how engineers know when they are involved in a conflict of interest. There are various forms of conflict, as well as divergent interests associated with being an engineer.
Points for Discussion
On the Lookout for Conflict of Interests
What should Hardin have done about the conflict of interest once it developed? He could have declined to respond to the inquiry when Hoyt referred it to him, passing it on to his subcommittee (minus James) and leaving it to them to decide what to do with it without his participation. Or he could have informed Hoyt that he had already committed himself on the question informally (and helped draft the inquiry), leaving to Hoyt the decision whether Hardin should participate. Had Hardin done either, no one would have had reason to doubt his integrity, and his employer might have been saved $75,000.
Appendix A: ASME Code of Ethics of Engineers
The Fundamental Principles
Engineers uphold and advance the integrity, honor, and dignity of the Engineering profession by:
The Fundamental Canons
1. Engineers shall hold paramount the safety, health and welfare of the public in the performance of their professional duties.
2. Engineers shall perform services only in areas of their competence.
3. Engineers shall continue their professional development throughout their careers and shall provide opportunities for the professional development of those engineers under their
supervision.
4. Engineers shall act in professional matters for each employer or client as faithful agents or trustees, and shall avoid conflicts of interest.
5. Engineers shall build their professional reputation on the merit of their services and shall not compete unfairly with others.
6. Engineers shall associate only with reputable persons or organizations.
7. Engineers shall issue public statements only in an objective and truthful manner.
Appendix B: IEEE Code of Ethics (Revised October 1990)
|